9th Annual International Investment
Forum and Exhibition
East Russia Oil and Gas
2-3 July 2025, Vladivostok, Russia
2-3 July 2025, Vladivostok, Russia
East Russia Oil and Gas Forum is a professional international platform providing unprecedented opportunities to establish dialogue, share experience, search for solutions and consolidate the efforts of business and government for efficient development of key O&G projects in Eastern Siberia and the Far East, including the projects for processing facilities construction.
Amur Gas Processing Plant
The project was initiated by Gazprom Pererabotka Blagoveschensk (Gazprom Group) with estimated investment of 790 billion roubles. Construction is supervised by NIPIGAZ (SIBUR Group). The project is in its stage of development. Plant’s commissioning will enable to produce up to 2.6 tonnes of ethane, 1.6 million tonnes of liquified hydrocarbon gases, 60 million cubic meters of helium and 38 cubic meters of commercial gas. Nameplate capacity will be reached in 2025.
Nakhodka Plant of Mineral Fertilizers
NZMU will be built near the major seaport of Nakhodka, close to the target market — the Asia-Pacific region. The plant plans to produce 1.8 million tons of methanol (Phase 1) and 3 million tons of urea (Phase 2) annually. The monetary costs of the plant per ton are among the lowest in the world. The agreement on the development
of the NZMU project in the framework of Neftekhimichesky PDA is signed with the Far East Development Corporation.
Attainment of project capacity is planned for 2023.
Methanol production complex in Skovorodino
INITIATOR: Technoleasing (ESN Group)
ESTIMATED INVESTMENT: 55 billion RUB
Methanol complex is under construction. Phase 1 capacity will amount to 1 million tons per annum.
Commissioning is scheduled for 2025.
Irkutsk Oil Company’s Gas Project
The project was initiated by Irkutsk Oil Company and its estimated investment is over 450 billion roubles. The final project phase includes ethane-to-polymer plant construction in Ust-Kut (north of the Irkutsk region), it is a highly comprehensive technological facility for high-added-value polyethylene production. The project has been given a ten year timeframe, 2014-2024.
Far East LNG
The project was initiated by NK Rosneft and its estimated investment is $9.8 billion. A group of designers and researchers will arrive at the De-Kastri port of the Khabarovsk region in March 2020 to take part in LNG plant construction. They will prepare the site and inspect transport infrastructure condition. Preliminary commissioning date is 2027.
VOSTOK OIL
The Vostok Oil project will combine the largest deposits in the north of the Krasnoyarsk province. After reaching full capacity, the project's output will range from 50 million to 100 million tons of oil per year. In the North Bay on the Taimyr Peninsula, it is planned to build a port with a capacity of 115 million tons. An oil pipeline with a length of about 400 km will be built from the Payakhskoye field to this port. Oil from the port will be exported via the Northern Sea Route by ice-class tankers.The project was initiated by Rosneft and its estimated investment is 10 trillion roubles.
Deputy Director for Projects (Gas Carrier Fleet)
Zvezda Shipbuilding Complex
First Deputy General Director
Gazprom Promgaz
Head of Gas Supply and Reserve Fuel Deliveries Department
Far Eastern Generating Company
Head of Gas Supply and Reserve Fuel Deliveries Department
Far Eastern Generating Company
Executive Director
Remstal Company
Deputy General Director for Science
Gazprom Promgaz
Industry Insights
Overview of the state of the industry and prospects for the development of oil and gas projects in Eastern Siberia and the Far East
150+ participants – commercial and technical managers of key plants in the exploration, production, development, transportation and processing of oil and gas in the Far East and Eastern Siberia region, representatives of regulatory authorities, technological and engineering companies
40+ major oil and gas projects: a look into the future. Plans for the construction, modernisation and expansion of production facilities with a timeframe until 2035 and later
2 days of business and informal networking. Pre-scheduled one-on-one meetings, a welcome cocktail, a festive reception, business lunches, coffee breaks, interactive discussions and much more
Opening meeting – The future of oil and gas in the Far East and Eastern Siberia: ways of development and solutions
It is important! Expansion of export infrastructure: current challenges and solutions
How do modern technologies help optimise processes in the oil and gas industry? Case studies
FOCUS SESSION. Gas processing and gas chemistry: new horizons and opportunities
NEW! Prospects for the development of Arctic mineral resource centres. Offshore exploration
Reducing energy costs in oil and gas projects: innovative technologies and techniques
Award ceremony and cocktail reception. Awarding the best companies, innovative projects and experts. Buffet and informal networking