East Russia Oil and Gas Forum is a professional international platform providing unprecedented opportunities to establish dialogue, share experience, search for solutions and consolidate the efforts of business and government for efficient development of key O&G projects in Eastern Siberia and the Far East, including the projects for processing facilities construction.
Deputy Chairman of the Government
Government of the Primorye Territory
Minister
Ministry of Energy and Gas Supply of the Primorye Province
General Director
Far East Sinsin Corporation
General Director
Transneft Far East
Director of the Siberian branch
Gazprom Gazomotornoye Toplivo
Head of Department, Department of Scientific and Technical Support
Gazprom Invest
Director of Key Partner Relations
Institute of Oil and Gas Technology Initiatives
Adviser
Permanent Delegation of the Republic of Sakha (Yakutia) to the President of the Russian Federation
Adviser
Permanent Delegation of the Republic of Sakha (Yakutia) to the President of the Russian Federation
Amur Gas Processing Plant
The project was initiated by Gazprom Pererabotka Blagoveschensk (Gazprom Group) with estimated investment of 790 billion roubles. Construction is supervised by NIPIGAZ (SIBUR Group). The project is in its stage of development. Plant’s commissioning will enable to produce up to 2.6 tonnes of ethane, 1.6 million tonnes of liquified hydrocarbon gases, 60 million cubic meters of helium and 38 cubic meters of commercial gas. Nameplate capacity will be reached in 2025.
Nakhodka Plant of Mineral Fertilizers
NZMU will be built near the major seaport of Nakhodka, close to the target market — the Asia-Pacific region. The plant plans to produce 1.8 million tons of methanol (Phase 1) and 3 million tons of urea (Phase 2) annually. The monetary costs of the plant per ton are among the lowest in the world. The agreement on the development
of the NZMU project in the framework of Neftekhimichesky PDA is signed with the Far East Development Corporation.
Attainment of project capacity is planned for 2023.
Methanol production complex in Skovorodino
INITIATOR: Technoleasing (ESN Group)
ESTIMATED INVESTMENT: 55 billion RUB
Methanol complex is under construction. Phase 1 capacity will amount to 1 million tons per annum.
Commissioning is scheduled for 2025.
Irkutsk Oil Company’s Gas Project
The project was initiated by Irkutsk Oil Company and its estimated investment is over 450 billion roubles. The final project phase includes ethane-to-polymer plant construction in Ust-Kut (north of the Irkutsk region), it is a highly comprehensive technological facility for high-added-value polyethylene production. The project has been given a ten year timeframe, 2014-2024.
Far East LNG
The project was initiated by NK Rosneft and its estimated investment is $9.8 billion. A group of designers and researchers will arrive at the De-Kastri port of the Khabarovsk region in March 2020 to take part in LNG plant construction. They will prepare the site and inspect transport infrastructure condition. Preliminary commissioning date is 2027.
VOSTOK OIL
The Vostok Oil project will combine the largest deposits in the north of the Krasnoyarsk province. After reaching full capacity, the project's output will range from 50 million to 100 million tons of oil per year. In the North Bay on the Taimyr Peninsula, it is planned to build a port with a capacity of 115 million tons. An oil pipeline with a length of about 400 km will be built from the Payakhskoye field to this port. Oil from the port will be exported via the Northern Sea Route by ice-class tankers.The project was initiated by Rosneft and its estimated investment is 10 trillion roubles.
New reality: Development of oil and gas projects in the Far East and Eastern Siberia – state support measures, reorientation of markets, import substitution
30+ largest oil and gas projects: A look into the future. Plans for construction, modernisation, and expansion of production facilities with a deadline until 2035 and later
Focus session: Gasification of regions: development of gas infrastructure and LNG projects
Development of technological potential of oil and gas companies using the latest technologies
Oil and gas refining in new realities – status and prospects of projects
Important! The Far East and Eastern Siberia as investment territories. Starting up the projects and developing the existing ones in new economic conditions
Logistics challenges: setting up new chains and redistributing flows
From geological exploration to commercial production – challenges and solutions
New: Environmental safety. Decarbonisation strategies, state regulation measures
30+ hours of business and informal networking. Pre-scheduled one-on-one meetings, a welcome cocktail, a cocktail reception, business lunches, coffee breaks, interactive discussions, and much more
Industry Report
Overview of the state of the industry and prospects for the development of oil and gas projects in Eastern Siberia and the Far East